Show TOC

 Starting a New Costing Run Locate this document in the navigation structure

  1. Choose either

    •   Production orders:Logistics   Production   Shop Floor Control   Confirmation   Reprocessing   Actual Costs  

    • Process orders:   Logistics   Production – Process   Process Order   Confirmation   Recalculate Actual Costs  

  2. Enter your selection criteria.

  3. Choose  ( ) ( Execute ).

  4. Select the confirmation in question and choose  ( ) ( Error Log ).

    Analyze the errors.

  5. If necessary remove the errors.

    To remove the errors, you have to exit the reprocessing function.

  6. Choose   Production   Shop Floor Control   Confirmation   Reprocessing   Actual Costs   or   Production – Process   Process Order   Confirmation   Recalculate Actual Costs   or open a new session.

  7. Enter selection criteria for the confirmations for which you want to restart the actual cost calculation.

  8. Choose  ( ) ( Execute ).

  9. Select the confirmation and choose  ( ) ( Save ).