 Transferring BOMs to the Project System Locate this document in the navigation structure

Use

You use the order browser for BOM transfer, if you want to transfer a bill of material on a particular node of the overview tree to Project System.

Prerequisites

Here, the general prerequisites apply for the BOM transfer into the project system. For more information, see the component PS – Project System under BOM transfer .

You have ensured that no assembly in the multi-level BOM for the sales order item is used more than once. For more information, see Transfer and Assemblies Used More than Once .

The New Version indicator is set on the BOM browser: Settings screen.

Procedure

You are in the order browser.

  1. If necessary, select  ( ) , to ensure that you are using the current processing status.

  2. The system re-explodes the multi-level BOM.

  3. Select the header of the BOM that you want to transfer to the project system.

  1. In the context menu of the BOM header select BOM transfer PS .

You see the BOM Transfer screen. The following fields are already preassigned and are not ready for input:

  • Sales document (sales order number)

  • Sales document item (sales order item)

  • Material

  • Plant

  • BOM Usage

In the following fields you find default values that you can overwrite:

  • BOM type (material BOM or sales order BOM)

  • BOM application

  • Requirements quantity

  1. Enter the data that is not yet preassigned and click  ( ) .

See also:

BOM transfer into the project system