 Planned Costs for Production Locate this document in the navigation structure

Whether an operation is relevant to costing depends on its control key and its costing relevancy indicator :

  • You can specify via the control key of the operation whether the operation is relevant to costing.

  • If, according to its control key, the operation is relevant to costing, you must ensure that the costing relevancy indicator is set (general data screen) for the activity produced in the operation to be costed.