Show TOC

 Production Costs Locate this document in the navigation structure

The activity used in an order can be divided into internal activity and external activity. Planned costs are calculated for both.

The system calculates the planned costs for the activities contained in an operation or suboperation via the valuation variant specified for the order type (defined via the costing variant). The values of the individual activities are specified via the activities defined in cost center accounting.

For more information on the valuation of activities, refer to CO-CCA Cost Center Planning .

Note Note

In costing, suboperations are treated in the same way as operations. For this reason the following only describes the costing of operations.

End of the note.