 Use of Cost Estimates Without Quantity Structure Locate this document in the navigation structure

Use

A material cost estimate without a quantity structure enables you to:

  • Plan the costs for raw materials, internal activities, and external activities for a product in the form of a unit cost estimate

  • Assign the material overhead and production overhead to the product

  • Assign the costs to cost components and save them

  • Display the material usage costs for semifinished products grouped by cost component