This table is used if steps in production or process orders are to be updated in the SAP system.
Field |
Description |
Type |
Length |
---|---|---|---|
AUFNR |
Order number |
char |
12 |
EXTAUFNR |
External order number |
char |
12 |
APLFL |
Sequence number |
char |
6 |
VORNR |
Number of the operation |
char |
4 |
<FIELD> |
Field name of an order |
char |
10 |
<VALUE> |
Value of field <FIELD> for the order |
char |
50 |
The following fields are possible:
Field |
Description |
Type |
Length |
---|---|---|---|
ARBID |
This internal number, together with the object type, identifies the operating resource, such as the work center or production resources/tools. |
numc |
8 |
VGW01 |
Standard value |
char |
10 |
VGE01 |
Unit of the standard value |
char |
3 |
VGW02 |
Standard value |
char |
10 |
VGE02 |
Unit of the standard value |
char |
3 |
VGW03 |
Standard value |
char |
10 |
VGE03 |
Unit of the standard value |
char |
3 |
VGW04 |
Standard value |
char |
10 |
VGE04 |
Unit of the standard value |
char |
3 |
VGW05 |
Standard value |
char |
10 |
VGE05 |
Unit of the standard value |
char |
3 |
VGW06 |
Standard value |
char |
10 |
VGE06 |
Unit of the standard value |
char |
3 |
USR04 |
User-defined field for quantity |
char |
15 |
USE04 |
User-defined field for the unit of the quantity field |
char |
3 |
USR05 |
User-defined field for quantity |
char |
15 |
USE05 |
User-defined field for the unit of the quantity field |
char |
3 |
SPMUS |
Indicates that the operation is split. If the indicator is set and you have entered a number of splits greater than ”1”, the operation is split. If the indicator is set and you have not entered a number of splits, the operation is not split. If the indicator is set and you have entered a number of splits greater than ”1”, the operation is split in reduction, if necessary. The operation is only split if it is scheduled according to the operation control key. |
char |
1 |
SPLIM |
Number of splits |
char |
5 |
ZMINB |
Minimum processing time |
char |
10 |
ZEIMB |
Unit for the minimum processing time |
char |
3 |
UEMUS |
Indicator you use to specify that operations must overlap. The system always tries to overlap the operation with the next operation in scheduling. |
char |
1 |
UEKAN |
Indicator you use to specify that the operation is to overlap with the next operation, if necessary. When the execution time of the operation is reduced, the system tries to overlap operations. |
char |
1 |
ZMINU |
Minimum overlap time |
char |
10 |
ZEIMU |
Unit for the minimum overlap time |
char |
3 |
MINWE |
Minimum send ahead quantity |
char |
14 |
FLIES |
Indicates continuous flow production. In continuous flow production, the operation is overlapped with the next operation in scheduling as soon as the minimum send-ahead quantity is reached. |
char |
1 |
BMSCH |
Base quantity |
char |
14 |
FSEDD |
Earliest date when execution of operation can finish |
dats |
8 |
FSEDZ |
Earliest time when execution of operation can finish |
tims |
6 |
FSAVD |
Earliest date when execution ofoperation can start |
dats |
8 |
FSAVZ |
Earliest time when execution ofoperation can start |
tims |
6 |
FSSBD |
Earliest date when processing ofoperation can start |
dats |
8 |
FSSBZ |
Earliest time when processing ofoperation can start |
tims |
6 |
FSSAD |
Earliest date when teardown ofoperation can start |
dats |
8 |
FSSAZ |
Earliest time when teardown ofoperation can start |
tims |
6 |
SSEDD |
Latest date when execution of operation can finish |
dats |
8 |
SSEDZ |
Latest time when execution ofoperation can finish |
tims |
6 |
SSAVD |
Latest date when execution ofoperation can start |
dats |
8 |
SSAVZ |
Latest time when execution ofoperation can start |
tims |
6 |
SSSAD |
Latest date when teardown of operation can start |
dats |
8 |
SSSAZ |
Latest time when teardown ofoperation can start |
tims |
6 |
SSSBD |
Latest date when processing of operation can start |
dats |
8 |
SSSBZ |
Latest time when processing of operation can start |
tims |
6 |
CY_SEQNRV |
Sequence number for production order operations |
nunc |
14 (int) |
ESTAT |
|||
METHOD |
Methods are functions that can be carried out for only one object. Example: scheduling orders Possible values: Dispatch dispatching of an operation (status ”dispatched” is set once the operation receives the data changes and is rescheduled, if necessary, then the operation is fixed) Deallocate deallocation of an operation (status ”dispatched” is removed and the operation is no longer fixed) SetUserStatus RevokeUserStatus |
char |
50 |
Note
Field EXTAUFNR is only used for orders that were created during a transfer since the external optimization program does not recognize the order numbers assigned by the SAP system.
Operations are deallocated when scheduling-related changes are made.
Always enter the date and time in the specified format.
You can enter the date and time for an operation in two ways:
Specification of one date/time element. The SAP system schedules the operation and calculates all date/time elements.
Specification of all date/time elements.
If you enter the date and time and choose Dispatch as the method, the SAP system no longer changes the times when scheduling.
Scheduling-related changes in the planned order automatically trigger deallocation.
You can define the work center either using the field ARBID or the fields ARBPL and WERKS.