Show TOC

 Updating the Preliminary Cost Estimate Locate this document in the navigation structure

Prerequisites

Changes have been made to the routing.

Procedure

  1. Choose   Accounting   Controlling   Product Cost Controlling   Product Cost by Period   Planning   Preliminary Costing for Product Cost Collector  

  2. The screen Creation of Preliminary Cost Estimates for Product Cost Collectors appears.

  3. Enter data as required.

  4. Choose   Program   Execute   .

Result

The system updates the preliminary cost estimate in accordance with the data you entered in the selection screen.

The reporting point backflushes of the current period are converted.

See also:

For detailed information on conversion with changes reporting point structures, see the following section:

Flexible Reporting Points

For general information on the preliminary costing for product cost collectors, see the following section:

Preliminary Cost Estimates for Product Cost Collectors