Show TOC

 Calling Up the Selection Screen Locate this document in the navigation structure

Prerequisites

On the selection screens you can select the desired data during the capacity evaluation.

Procedure

Calling up the initial selection screen

You reach this selection screen automatically:

  • When calling up the capacity evaluation

  • When you want to start a new evaluation with the same overall profile in the capacity evaluation by choosing   Planning   Other planning   .

  • When you want to make a new selection or choose a new overall profile and start a new evaluation in the capacity evaluation with   Planning   Profiles   .

  • If you want to leave the Selection list with Back or Cancel .

Caution Caution

When you call up the screen Selection the current values of the selection criteria are deleted.

End of the caution.

Calling up other selection screens (for example, selection by work center)

Choose the desired selection screen by choosing   Planning   Selection   .

To call up a selection screen that is not included in the menu, choose   Planning   Selection   Kombination   and enter a combination.

Note Note

The selection screen for the selection by work center gives you the option of Detailed selection and hierarchy selection .

End of the note.