Show TOC

 CLOI_ORDI_IMP Locate this document in the navigation structure

This table is used if production or process orders are to be created in the SAP system.

CLOIORDI

Field

Description

Type

Length

EXTAUFNR

External order number

char

10

<FIELD>

Field name of an order

char

10

<VALUE>

Value of field <FIELD> for the order

char

50

The following fields are possible:

<FIELD>

Description

Type

Length

Required entry

MATNR

Material key

char

18

Yes

WERKS

Plant key

char

4

Yes

AUART

Order type

char

4

Yes

BDMNG

Quantity of the material component necessary to produce the specified order quantity

char

14

Yes

GSTRP

Basic start date

dats

8

Yes or GLTRP corresponding to scheduling direction

GSUZP

Basic start date (time)

tims

6

GLTRP

Basic finish date

dats

8

Yes or GSTRP corresponding to scheduling direction

GLUZP

End time of order

tims

6

VERID

Key specifying the various production techniques that can be used to produce a material

char

4

KDAUF

Sales order key

char

10

PLNNR

PLNAL

PLNTY

GMEIN

Key for task list group

Group counter

Task list type

Unit of measurement for order

char

char

char

unit

8

2

1

3

Use these fields if you want to create an order without a material. They cannot be used separately or with field MATNR

KDPOS

Number uniquely identifying an item within a sales order

numc

6

CY_SEQNR

Sequence number for production order

numc

14 (int)

ESTAT

User status. Must be used together with either Set User Status or Revoke User Status. User status must be transferred in internal format (E number from table TJ30)

char

5 (int)

METHOD

Methods are functions that can be carried out for only one object. Example: scheduling orders

Possible values:

SetTechnicalComplete

RevokeTechnicalCompletion

Schedule

Release

SetUserStatus

RevokeUserStatus

char

1

Note Note

After you create a production order, the system carries out scheduling.

You must enter the date and time in the specified format.

The scrap quantity is taken from the material master or bill of material.

In order to enable scheduling with times, the following scheduling types must be defined in Customizing (   IMG   Production   Capacity Requirements Planning   Operations   Scheduling   Specify scheduling type)   :

5 = Forward scheduling

6= Backward scheduling

End of the note.