Show TOC

Background documentationTest Plan Maintenance Locate this document in the navigation structure

 

You use this activity to create or edit the test plan used for automatic material testing. The machine requests the plan for execution to build the material and then passes the information back to the system for historical SPC data (see Statistical Process Control (SPC)).

Note Note

This activity works similarly to Data Collection Maintenance, except for the fact that you work in the machine interface. The machine asks for a data parameter to collect using the values you specify in Test Plan Maintenance. The data collected is stored against an SFC number. For more information, see Data Collection (DC).

End of the note.
Fields

The following table describes fields requiring explanation:

Field

Description

Insert Parent Measurement

Displays the Measurement Details screen where you can add a new measurement to the test plan

Insert Child Measurement

Displays the Measurement Details screen where you can add a new child measurement to a test plan

Measurement

The unique identifier of the measurement

Low

The minimum acceptable measurement value

High

The maximum acceptable measurement value

Status

If enabled, the measurement is taken within the test plan

More Information

Parametric SFC Check