Background documentationTransfer of Production Yield Confirmation: Integration Details Locate this document in the navigation structure

 

  • SAP ME sends an ERP yield confirmation per SFC number / reporting step with the following information:

    • Production Order

    • Operation

    • Yield

    • Quantity

    • Base Unit of Measure of the produced material

    • Components consumed at this operation and operations before this ERP reporting step including component batch information provided for each component assembled onto the SFC number

    • Batch Number

      If an SFC number is manufactured in SAP ME, batch information is obtained from the shop order of this component, otherwise form the assembled inventory ID

    • Serial Number

    • Storage Location of the inventory ID or from the material master maintained in SAP ME

      Populated from SAP ERP material master (Prod. Stor. Location on the MRP 2 tab page) during the download.

  • When the last reporting step is completed in SAP ME, SAPMEINT also sends the goods receipt of the output material.

    This is indicated by the IS_LAST_REPORTING_STEP routing custom data field. If the value is true, SAPMEINT reports the following:

    • Batch Number

    • Batch Characteristic

    • Base Unit of Measure of the produced material

  • Storage Location is not transferred, it is taken from SAP ERP production order. If there is a requirement to get this information from SAP ME material muster, change the outbound XSLT file.

  • SAP ME sends the confirmation of the Automatic Final Confirmation type so that SAP ERP can automatically determine relevant actions such as clearing reservations and capacity reduction.

  • Batch characteristics are reported to SAP ERP 6.00 – 6.04 with the message type BatchCharsPosting or with the normal confirmation message to SAP ERP 6.05.

  • If a confirmation was not successful due to locking in SAP ERP, SAPMEINT re-sends the messages to SAP ERP based on Retry Period defined in SAPMEINT Workflow Configuration (see SAPMEINT Workflow Configuration).

Restrictions
  • SAPMEINT does not report activity times.

  • SAP ME does not support the ERP concept of different unit of measure at the operation level.

  • Nested routings are not supported when Close and Done in SAP ME Pack/Unpack is used.

  • SAPMEINT sends confirmations to SAP ERP only for closed containers of the Material pack level. Containers of the Container or Process Lot pack level are not processed (see Container Maintenance).

  • Partial yield is not supported.