Start of Content Area

Function documentationMaterials Planning  Locate the document in its SAP Library structure

Use

You can assign any number of material components to an operation. A component can be a spare part or repairable spare or describe an activity. The material that you schedule for an order is reserved for the order in the warehouse. As soon as the order is released, the materials can be withdrawn from the warehouse and delivered to the customer.

The material can be BOM components of the reference object, or material that has been created in the system in Materials Management.

External Procurement Processing

This graphic is explained in the accompanying text

Prerequisites

If you want purchase requisitions to be generated when the order is created, you must have set the Res/PReq. indicator in the Customizing for Functions and Settings for Order Types by choosing Define Change Docs, Collective Purc. Req. Indicator, Operation No. Interval. If you have not set this indicator, reservations and purchase requisitions are only generated when the order is released. Refer to Material Requirements Planning.

You must enter the correct item category for each material. The following item categories are available in the standard system:

Features

Note

You cannot plan material for sub-operations.

Reservations and Purchase Requisitions

The following applies for planned material:

The term "reservation" can have the following meanings:

Note

In contrast to the Materials Management (MM) application component, it is not possible to create a reservation or a purchase requisition individually in the Plant Maintenance (PM) application component. Both are generated automatically by the system.

Entry and Calling Up of Other Data

You can also perform the following for each component:

Search for Material

You can search for material that you require in the system according to the following criteria:

Customer Exits

The following customer exits are also available:

For more information, see Tools ABAP Workbench Utilities Enhancements Definition. Enter the name of the customer exit and choose Documentation Display.

See also:

Work Scheduling Using Bills of Material

Planning Stock Material

Displaying, Changing and Deleting Material

Checking Stock Material Availability

Purchase Order for Material Using External Procurement System

 

 

 

End of Content Area