Dismantling Non-Serialized Material with
Simultaneous Material Movement
You want to remove a non-serialized material from a superordinate piece of equipment and add it to stock.
The superordinate equipment must be an equipment BOM header with Configuration Control usage.
...
1. Choose Logistics → Plant Maintenance → Maintenance of Technical Objects → Configuration Control → Installation and Dismantling of Components from the SAP Easy Access screen.
2. In the mode list field, select Dismantle Non-Ser. Mat. with Material Movement if the appropriate screen is not automatically displayed.
3.
Enter a material
number in the Material group box,
and choose
Enter.
4. Enter the quantity to be dismantled.
5. Enter the current installation location of the corresponding material.
6. Enter either a reservation or a movement type.
7. Enter a reference order, if required.
8. Select an event type and a part status on the Notification tab page.
9.
If you want to
simulate the removal before saving, choose
Check. You can display the search result in a full
screen application log. Choose
Application Log to
do this.
10. Save your entries.

You cannot choose forced removal for this mode
● The non-serialized material is removed from the equipment BOM header and the corresponding material is placed into storage. If the corresponding Business Add-In is active, a notification is generated or updated.
● After the non-serialized material is dismantled, a structure gap is automatically generated or its quantity is increased.
● If the corresponding BAdI is active, a notification is generated or updated.