Configuration Control
Configuration Control Workbench
Preparatory Activities for the Configuration Check
Actual Configuration
Non-Serialized Parts in the Equipment BOM
Structure Gaps
Creating and Deleting Structure Gaps
Function Identifier
Defining a Function Identifier
Linking Equipment with iPPE Access Nodes
Displaying the Actual Configuration
Master Parts List
Cancel-Part Relationships
Processing Cancel-Part Relationships
Conversion of Standard iPPE (PVS) Structures to MPL Structures
Overall Configuration Check
Quantity Check
Performing a Configuration Check
Configuration Check Log
Business Add-Ins
Change of the Actual Configuration
Modes for Changing the Actual Configuration
User-Specific and User-Group-Specific Settings
Installation of Components
Installing Equipment with Simultaneous Material Movement
Installing Equipment Without Simultaneous Material Movement
Goods Movement out of Stock Without PM Integration
Installing Non-Serialized Materials with Simultaneous Material M
Dismantling of Components
Dismantling Equipment with Simultaneous Material Movement
Dismantling Equipment Without Simultaneous Material Movement
Goods Movement into Stock Without PM Integration
Dismantling Non-Serialized Material with Simultaneous Material M
Movement and Special Stock Types for Installation and Dismantlin
Swapping of Equipment
Swapping Equipment
MPL Checks Options During Installation
Local Configuration Check
Business Add-Ins
Archiving in Configuration Control