  Reconstructing Assigned Values Locate this document in the navigation structure

Use

Reconstructing the assigned values ensures that availability control can recognize an excessive funds assignment in the new hierarchy or in a budget structure element in time, in accordance with the changes you have made (such as budget profile, follow-up posting). If you do not reconstruct the assigned values, availability control makes its checks based on the “old” dataset.

A reconstruction of assigned values is necessary in the system following these activities:

Availability control was deactivated and then reactivated

The company code/FM area assignment was deactivated and then reactivated

the budget profile assignment was changed

The generic search sequence was changed

The budget structure was either regenerated, changed, or deleted a budget structure, and distributed values reconstructed.

Changes were made in your budget profile (such as releases/budget) for availability control.

The actual data for Funds Management was reconstructed.

Within the framework of closing operations, Open Commitments Documents were carried forward into the new fiscal year.

the cover eligibility (unilateral cover eligibility, reciprocal cover eligibility or revenues increasing the budget in the call procedure) were activated, budget allocated and the corresponding rules maintained

This graphic is explained in the accompanying text.

If not all of the expenditure FM account assignments of a cover pool, but only one or several are also in a unilateral cover eligibility relationship or are linked with a revenue item in the call procedure for revenues increasing the budget, it can lead to an exceeding of the budget after the reconstruction of the assigned values.

If this condition is met by you, you must cancel the cross assignments to avoid an exceeding of the budget prior to the reconstruction of assigned values, in order to save the the budget claimed in the expenditure FM account assignment as "real" budget. For more information on cancelling cross assignments, see: Cancel Cross Assignments

Prerequisites

There must be at least one budget structure element with a budget.

Ensure that no other activities, particularly budgeting or document entry, can be carried out in the system while the reconstruction is in progress.

Activities

To reconstruct the assigned values, choose Budgeting Former Budgeting Tools Reconstruct Assigned Values.

You must enter an FM area and a Fiscal year independent of whether you are working with annual values or overall values.

The graphic below illustrates the flow of assigned value reconstruction. Note that the system only outputs a log if the reconstruction leads to a budget overrun.

This graphic is explained in the accompanying text.

Assigned Values Reconstruction