Show TOC

Procedure documentationConfiguring the ABAP Front-End Server Locate this document in the navigation structure

 

After the complete infrastructure is installed, you must perform the required configuration activities for the ABAP front-end server.

Procedure

  1. Configure SAP NetWeaver Gateway.

    1. Connect SAP NetWeaver Gateway to SAP Business Suite (trusted RFC).

    2. Create system alias for applications.

    3. Activate OData services.

    4. Specify language settings.

  2. Configure the central UI add-on.

    1. Set up the SAP Fiori launchpad.

  3. Configure the product-specific UI add-on.

    1. Activate the ICF services.

    2. Set up catalogs, groups, and roles for the SAP Fiori launchpad.