The analytical app displays the Key Performance Indicator (KPI) Overdue Network Activities. You can display all network activities that are overdue across projects.
Enables you to drill-down to specific details of the network activity.
Displays the partial project hierarchy structure from the selected network activity up to the project definition.
Calculates the number of days by which a network activity is overdue to start or finish. This calculation is done with reference to the latest scheduled dates (basic) of the network activity. If this date is not available, the calculation rule uses the basic start and basic finish dates respectively.
You can group the network activities based on a project and range of days overdue.
You can filter the network activities based on any of the following options:
Range of days overdue
Project
Network
Activity type
You can navigate to related transactional apps and fact sheets.
Integration with the SAP Jam collaboration platform.
The app offers the possibility to directly access other apps.
Note
These linked apps have to be already available in your system landscape or you have to implement them along with this app.
Confirm Network Activity transactional app
Change Network Activity Status transactional app
Project fact sheet
WBSElement fact sheet
The app consists of front-end components and back-end components. The back-end and the front-end components are delivered in separate products and have to be installed in a system landscape that is enabled for SAP Fiori.
SAP Smart Business Product | SAP Smart Business 1.0 for SAP ERP |
---|---|
Contains Virtual Data Model (VDM) | SAP HANA Analytics for ERP 1.0 |
SAP Business Suite Product | SAP enhancement package 7 for SAP ERP 6.0 SPS05 |
For more information about the system landscape to run SAP Smart Business cockpits, see Installation.
PS-IS