Some process flows are relevant to all engineering change requests, irrespective of the change type. These process flows are controlled by means of the system status.
For example, an engineering change request (ECR) must be converted to an engineering change order (ECO) before you can change objects with reference to the change number.

The process is controlled by the system status in the following way:

Different status networks that are bound together are defined for the different status objects (ECR and ECO). This means that you cannot change an ECR to an ECO until all change objects have been checked.