The material replacement has changed the gross weight of material PP-SATST01. Since the material is allocated to alternative date DAT-01, the change is made on September 25, 1998, not on October 1, 1998 (the valid-from date in the change master header). The change is made with the Change material function.
To change a material with reference to a change number:
You see the Change Material: Initial Screen.
Confirm your entries.
The screen you selected appears, for example Change Material: Engineering/design.
To display the material data changed with reference to a change number in the material master record:
You see the Display Material: Initial Screen.
Confirm your entries.
The screen you selected appears, for example Display Material: Engineering/design.
You see the Display Changes: Material Overview screen with a list of the change documents that have been created. The documents are listed in chronological order. The last document created is in the first line.
The following data is shown for each change document: Date, Time, user the material was last Changed by, Change number, and Transaction code of the change function.
For example, you can make the following transactions with reference to a change number:
MM01 Create material general
MM02 Change material
MM11 Create material (schedule)
MM12 Change material (schedule)
MM13 Activation of scheduled changes at a key date
You see the Display Changes: Change Number screen.