Procedure documentation Changing Material PP-SATST01  Locate the document in its SAP Library structure

The material replacement has changed the gross weight of material PP-SATST01. Since the material is allocated to alternative date DAT-01, the change is made on September 25, 1998, not on October 1, 1998 (the valid-from date in the change master header). The change is made with the Change material function.

To change a material with reference to a change number:

  1. From the material master menu, choose Material ® Change.
  2. You see the Change Material: Initial Screen.

  3. Enter the material and the change number.
  4. Confirm your entries.

  5. Select the view you require and an organizational level if required, for example, Engineering/design in plant A100.
  6. The screen you selected appears, for example Change Material: Engineering/design.

  7. Enter or correct your material data.
  8. Save your data.

To display the material data changed with reference to a change number in the material master record:

  1. From the material master menu, choose Material ® Display.
  2. You see the Display Material: Initial Screen.

  3. Enter the material.
  4. Confirm your entries.

  5. In the dialog box, select the view you require and an organizational level if required, such as the Engineering/design view in plant A100.
  6. The screen you selected appears, for example Display Material: Engineering/design.

  7. Choose Environment ® Display changes.
  8. You see the Display Changes: Material Overview screen with a list of the change documents that have been created. The documents are listed in chronological order. The last document created is in the first line.

    The following data is shown for each change document: Date, Time, user the material was last Changed by, Change number, and Transaction code of the change function.

    For example, you can make the following transactions with reference to a change number:

    MM01 Create material general

    MM02 Change material

    MM11 Create material (schedule)

    MM12 Change material (schedule)

    MM13 Activation of scheduled changes at a key date

  9. Place the cursor on the line containing the change document that you want to display the actual change for.
  10. Choose the Choose pushbutton.

You see the Display Changes: Change Number screen.