Changing a Material with Reference to a Change Number
Changes to a material are stored in a change document rather than being saved in the material master record itself. The valid-from date is stored in the change document header.
Changes to the material master record with reference to a change number are made independently of the function.
See also:
Special Features of the Material Object TypeChanging a Material Immediately
You can change the data in a material master record immediately. To do this, choose the Material
® Change ® Immediately function (transaction MM02).Scheduling Material Changes
Changes to materials can be scheduled. To do this, choose the function Material
® Change ® Schedule (Transaction MM12). If you do this, you will schedule the change to take place on a future date.When you activate scheduled changes, all changes to this material are read and transferred to the batch-input interface. A "real" change document is created. When you activate changes, the document number of the new "real" change document is saved to the change documents for the changes being activated, as activation data.
The "real" change document contains the information that it was created by activating changes.
This section describes a change to the design data in material master record PP-SATST01.