Start of Content Area

Conceptual documentation Change Master Record: Example PP-SATST  Locate the document in its SAP Library structure

Suppose the tubing for the saddle support of a bicycle has to be replaced. Because of this design change, changes have to be made to a bill of material, a task list, a document, and a material master record. All these objects are changed with reference to the same change number.

The overview below shows the SAP objects that are to be changed with this change number.

Key Data of Change Objects

BOM

Routing

Document

Material

Material number:
PP-SATST01

Type:
N

Document number:
SATST

Material number:
PP-SATST01

Plant:
A100

Group:
0000A100

Document type:
DRW

 

Usage:
1

 

Document part
001

 
   

Version:
01

 

Change Master Record Data

All changes are made with reference to change master record PP- SATST.
The following data is maintained for this change master record:

Change Header Data of PP-SATST

Fields

Field Value

Change number description:

Change to saddle support

Valid from:

01.10.1998

Status of change number

01 (active)

Reason for change

Material replacement

Object Type Indicators

Indicator

Field Value

Object type active for change number (Act.)

Set for the following object types:
BOM
Task list
Material
Document

Object management record generated (MgtRec)

Set

Note

The object overviews contain no objects at first.

Object Management Records

In this change master record, the indicators are set such that object management records are generated for bills of material, task lists, documents, and materials when you process the objects with reference to the change number.

Since the design data of material PP-SATST01 is to be changed on September 25 1998, the object management record for material PP-SATST01 is entered manually in the Material BOM object overview.
The object management record for material PP-SATST01 is then allocated to an alternative date to give the material this alternative valid-from date.

Alternative Dates

Alternative date DAT-01 is created in the change master record. This date is to replace the general valid-from date in the change master header for material PP-SATST01.
Alternative date DAT-01 is used to define the following date: 25.09.1998.
September 25 1998.
Only material PP-SATST01 is allocated to this alternative date.