Valid-From Date and Object Type
When you edit a change object with reference to a change number, the valid-from date in the change master record is established as a change date. The following checks are available for different change objects.
Valid-From Date Check in the Change Master Record
Change object |
Valid-From Date Check |
BOM |
BOM must be effective |
Routing |
Task list must be effective |
Documents |
No limitations |
Material Create ® schedule |
|
Classification system objects |
No limitations |
Variant configuration objects |
No limitations |
Substances |
|
Phases |
|
Dangerous goods |