Start of Content Area

Procedure documentation Shifting the Valid-From Date  Locate the document in its SAP Library structure

Use

If changes have already been made to objects, you can no longer change the valid-from date. In this case, you must use the Shift date function.

The system checks the control data settings in Customizing.

See also:

Protected Time Period

Procedure

If you want to shift the valid-from date, proceed as follows:

  1. Go to the Change header screen.
  2. Choose Edit ® Other ® Shift date.
  3. You see the Shift date dialog box.

  4. Enter the new valid-from date and confirm your entry. The system checks the change objects. One of the following situations will result:

Confirm this message and cancel the date shift function.

If the date shift causes a warning or error message to be displayed, the system generates a temporary log for all the BOMs and task lists concerned. This log lists all the change objects that do not allow the valid-from date to be shifted.

Check the effectivity periods of the change objects as required.