Start of Content Area

Procedure documentation Extend a One-Day Trip to Several Days  Locate the document in its SAP Library structure

Procedure

  1. Choose Travel calendar.
  2. The Travel calendar: Domestic trips screen appears.

  3. Select a one-day trip.
  4. Delete the end time.
  5. Enter the new end time under the relevant end date of the trip.
  6. Press Enter.
  7. The system displays the trip as a several-day trip.

  8. Save the trip.

Result

The system has stored the one-day trip as a several-day trip in the database.