Use
With automatic dispatching with setup time optimization, you can dispatch a group of operations on the capacity planning table without leaving any gaps while minimizing the setup time at the target work centers. This dispatching procedure is especially suitable for the initial commitment of resources.
This function is not available for capacity leveling in the process industry (PP-PI), that is, for capacity leveling of process orders and planned orders that refer to master recipes.
Prerequisites
Planning direction forwards |
is activated |
Dispatch at best time for setup |
is deactivated |
Dispatch at earliest point in time |
is deactivated |
Date entry when dispatching |
is deactivated |
If you do not maintain the setup matrix or if a setup transition is not specified in the setup matrix, then the setup standard value in the operation is used. In the control profile, you specify globally for all operations which standard value is to be treated as the setup standard value.
Activities
Procedure and results of setup time optimization
For every target work center, the operations to be dispatched are first of all automatically arranged in the sequence with the smallest total setup time. The system takes the initial setup state of the work center into account. It also takes account of forbidden setup transitions. Then the operations are dispatched to the work center in this sequence without any gaps and with the new setup times. The setup standard values in the operations dispatched are overwritten with the setup standard values from the setup matrix.
If you deallocate the operations again, they are given back their original setup values so long as you have not saved your planning.
Dispatching date
There are the following options for the dispatching date:
Specification of the initial setup state of a work center
If there is no commitment at the work center in the evaluation period, then the setup state at the work center is not defined by an operation.
You can define the initial setup state by entering an Initial setup state in the strategy profile. The setup time of the first operation is calculated using the standard value saved in the setup time matrix for the transition between the initial setup state and the setup state given for the operation. If you do not specify an initial setup state in the strategy profile, the setup time of the operation is calculated using the setup standard value in the operation.