Procedure documentation Notes on Grace Days and Days in Arrears  Locate the document in its SAP Library structure

You usually enter the same number of days for grace days (line item) and days in arrears (first dunning level). This ensures that all items that can be assigned to a certain dunning level are also printed on the dunning notice. The system therefore defaults the number of grace days when you define the dunning levels.

If the number of grace days does not equal the number of days in arrears, you should note the following: