Show TOC

Process documentationEvent 02: After Saving the Data in the Database Locate this document in the navigation structure

 

This event occurs as soon as the data have been written to the database. Other activities can be performed, for example:

  • Maintain background tables

  • Connect application log

Process

There are no standard routines for this event. The internal table TOTAL is available for the realization of the individual routines.