Show TOC

 App Implementation: My Projects

System Landscape Requirements

Before you can start to implement the app, ensure that your system landscape has been set up to enable SAP Fiori and that this system landscape already includes the front-end components and back-end components for your app:

SAP Fiori System Landscape Options

Configuration of Front-End Server

Configuration of SAP Fiori Infrastructure

Back-End Components Delivered with (Product Version Stack)

SAP Simple Finance, on-premise edition 1503 SPS 05

Front-End Components Delivered with (Product Version Stack)

SAP Fiori for SAP Simple Finance, on-premise edition 1503 SPS 05

Ensure that the front-end component of the app is in place on your front-end server. It is automatically installed with the UI-Add-On.

Front-End Server: Front-End Component of App (Corresponding Product Version Instance)

UIAPFI70 200

For more information about the installation of SAP Fiori products, see Downloading and Installing Product Versions.

Required SAP Notes

For My Projects, the following SAP Notes must be available:

Back-End/Front-End Server

SAP Note Number

Description

Front-End and Back-End

2009780Information published on SAP site

Release Note for Fiori app My Projects

Implementation Tasks

The following sections list tasks that have to be performed to implement the app. You can find the data required to perform these tasks in the SAP Fiori apps reference library under the following link (choose Implementation Information and select the relevant delivery date):

Front-End Server: Activate OData Services

Component

Technical Name

OData Service (Version Number)

FCO_MP_SRV (1)

For more information about activating OData services, see Front-End Server: Activate OData Services.

Front-End Server: Activate SAP UI5 Application

Component

Technical Name

SAP UI5 Application

FIN_MYPROJECTS

For more information about how to activate the ICF service, see Front-End Server: Activate ICF Services of SAPUI5 Application (for transactional apps) or Activate ICF Service of BSP Application (fact sheets).

Front-End Server: Enable App for Access in SAP Fiori Launchpad

The SAP Fiori launchpad is the entry point to SAP Fiori apps. In the launchpad, the user can see and access those Fiori apps that have been assigned by an administrator to the catalog designed for this user's role.

The administrator makes these assignments in the launchpad designer. For more information, see Setup of Catalogs, Groups, and Roles in the SAP Fiori Launchpad.

SAP delivers technical catalogs for groups of SAP Fiori apps as repositories to create your own catalogs in the launchpad designer. Along with these catalogs, more technical content is delivered for each SAP Fiori app. You can find the delivered technical content for each SAP Fiori app in the SAP Fiori apps reference library.

Front-End Server and Back-End Server: Assign OData Service Authorizations to Users

You must assign OData service authorizations for the app to your users.

Caution Caution

Several authorization default values are connected to the OData service. To ensure that all these default values are assigned to a user, you have to follow the instructions given under the documentation links provided.

End of the caution.

Make the assignment on the back-end server and on the front-end server:

OData Service (Version Number)

Back-End Server: Delivered Authorization Role (PFCG Role)

Front-End Server: Assignment to Authorization Role

FCO_MP_SRV (1)

OData service authorization is included in the example role SAP_FIN_MYPROJECTS_APP.

Note Note

In addition, this role contains authorizations to display the related business data.

End of the note.

You need to assign the OData service authorization to a business role. To do this, you can use the business role SAP_SFIN_BCR_COSTMANAGER. Alternatively, you can also copy this business role and adjust it to your needs.

Configuration Tasks

To enable My Projects, you must perform the following configuration tasks:

  • User role configuration:

    • Front-end system (gateway system)

      1. Run transaction SU01, specify a user and click Edit.

      2. On the Roles tab, enter the following roles:

        • SAP_FIN_TCR_FSA

        • SAP_FIN_TCR_T

        • SAP_SFIN_BCR_COSTMANAGER

      3. Click Save.

  • Back-end system (ECC system with business data)

    If the gateway system and the back-end system are on the same system, follow these steps in the same system:

    1. Run transaction PFCG, enter role SAP_FIN_MYPROJECTS_APP and click Copy.

    2. Enter a target role, for example, Z_FIN_MYPROJECTS_APP, and click Copy All.

    3. Click Edit.

    4. On the Authorization tab, click Propose Profile Name.

    5. Click Save.

    6. Click Change Authorization Data.

    7. Enter the controlling areas to which the user has access.

    8. Click Save.

    9. Enter values for other authorization objects to which the user has access.

    10. Click Save and then Generate, and the status of authorization becomes “generated”.

    11. Assign this role to the user by following the steps introduced in Front-end system (gateway system) in the back-end system.

    12. Repeat steps 1 through 11 for the following roles:

      • SAP_FIN_COSTCENTER_APP

      • SAP_FIN_CONTROLLING_DOC_APP

      • SAP_FIN_COSTCENTERGROUP_APP

      • SAP_FIN_COSTELEMENT_APP

      • SAP_FIN_COST_ELEMENT_GRP_APP

      • SAP_FIN_PROFIT_CENTER_APP

      • SAP_FIN_INTERNALORDER_APP

  • Business configuration:

    1. Run transaction FPB_MAINTAIN_PERS_S in the back-end system.

    2. Enter DIA_CCMONITOR in Personalization Dialog, enter your target user, and then click Execute.

    3. Specify your controlling area, cost center group and then click Save. (Cost Center Group and Controlling Area are required, because the application cannot recognize individual values.)

    4. In the next page, enter DIA_IOMONITOR in Personalization Dialog, enter your target user, and then click Execute.

    5. Specify your controlling area, internal order group, cost element group, and then click Save. (Controlling Area, Internal Order Group and Cost Element Group are required, because the application cannot recognize individual values.)

Integration with SAP JAM

You can integrate this app with SAP JAM so that you can share your content and discuss a project once you have finished the configuration for this app. Follow the instructions on the following SAP Help Portal page to set up your environment for SAP JAM integration, http://help.sap.com/netweaver/Information published on SAP site under Start of the navigation path User Interface Add-On 1.0 for SAP NetWeaver Next navigation step Application Help Next navigation step Social Media Integration Next navigation step Administration Guide Next navigation step Implementation Requirements for SAP Jam Integration Next navigation step Implementation of Collaboration SAPUI5 Components Next navigation step Using the Discuss and Share Features in SAP Jam End of the navigation path.

More Information

For general information about the user management concept in a SAP Fiori environment, see Users in ABAP Front-End System and Users in ABAP Back-End System.