| planning location (SCM-APO-PPS) |
Location in which a product is planned and receipts are created for the product.
For a product produced in-house, the system can create the requirements for the components and the receipts for co-products and by-products in a production location that is different from the planning location. This is relevant for the form of procurement "production in another location" and for planning with MRP areas.