Requirement (Demand) Data
The fields on the Requirements (Demand)
tab page in location product master data maintenance are only relevant if you are working with Production Planning and Detailed Scheduling (PP/DS) in SAP Advanced Planning and Optimization (SAP APO)
.
Requirement Strategy |
|
Fields/area |
Use to define... |
Default strategy |
How quantities forecast in APO Demand Planning are generated and sales orders are offset against the sales forecast (demand/requirement forecast). |
|
|
Always collective requirement |
That a collective dependent requirement is to be generated |
Possible individual customer requirement |
That an individual dependent requirement is generated if possible |
|
|
Consumption mode |
Whether you want to use backward and/or forward consumption |
Consumption period |
Number of calendar days for forward or backward consumption |
Assembly planning |
Whether the system performs forecast consumption for the product's dependent demand or transportation requirements when the dependent demand or transportation requirements change |
Pegging |
|
Fields/area |
Use to define... |
|
|
Pegging strategy |
How product requirements are covered |
Maximum earliness of a receipt |
The maximum period of time that a requirement element may lie before a receipt element in order for the system to establish a pegging relationship between them by setting a pegging edge. |
Maximum lateness of a receipt |
The maximum period of time that a receipt element may lie before a requirement element in order for the system to just about set a pegging edge between the two elements, thus establishing a pegging relationship. |
|
|
Alert threshold for earliness |
As of when an alert is issued if a receipt element lies before a requirement element in terms of time and there is a pegging relationship between the two.
You also use the alert thresholds to specify that premature or delayed receipts are taken into account to cover requirements or in the range-of-coverage (days' supply) calculation. End of the note. For more information, refer to the PP/DS documentation on the calculation of the range of coverage (days' supply). |
Alert threshold for lateness |
As of when an alert is issued if a receipt element lies after a requirement element in terms of time and there is a pegging relationship between the two. |
|
|
Product tolerance minus or plus |
The maximum allowed under- or overcoverage of the individual product tolerance in the requirement element as a percentage. |
|
|
Underdelivery tolerance |
The percentage tolerance value that specifies by how much the quantity actually delivered may fall short of an order quantity |
Overdelivery tolerance |
The percentage tolerance value that specifies by how must the quantity actually delivered may exceed an order quantity |
|
|
Use total order quantity (use total receipts) |
That the total order quantity must be consumed |
Consume quantity from total stock (use total stock) |
That the total stock must be consumed |
Available stocks |
|
Fields/area |
Use to define... |
Blocked stock, stock in transfer, stock in quality inspection, etc. |
Which stocks are regarded as available in Production Planning and Detailed Scheduling and in Capable-To-Match (CTM). This means that the system takes these stocks into account in the net requirement calculation and in dynamic pegging. |