Net Requirements Calculation (Heuristic SAP_PP_SL001)
Use
If a heuristic for planning standard lots (for example, the standard heuristic SAP_PP_002 or SAP_PP_SL001) should consider the shelf life conditions during planning, the
standard net requirements calculation only offsets stocks, receipts and requirements with compatible shelf life data.Prerequisites
You should not have set the consider fixed receipts first indicator in the heuristic settings. The net requirements calculation must therefore use the
minimize alerts procedure.Features
So that the net requirements calculation can offset a stock or receipt element with a requirements element, the elements must fulfill the following shelf life conditions:
Firmed receipt elements for which the heuristic does not find any suitable uncovered requirements create a surplus. The Alert Monitor can
display alerts for surpluses with limited shelf life. The heuristic creates procurement proposals for the uncovered requirements in the further planning process.