Conversion from SAP APO with R/3 Planned
Order
Once you have set the conversion indicator in SAP APO, the system carries out the following steps:
...
1. Send the planned order with conversion indicator to SAP R/3
2. Determine the order type and order category into which the order should be converted
See Determination of Order Type and Order Category
3. Convert the R/3 planned order into a manufacturing order
4. Merge with the detailed scheduling data sent from SAP APO
5. Save the manufacturing order
6. Return the R/3 order number to SAP APO