Characteristic Value Assignments and
Characteristic Requirements
The relationship between the characteristic value assignments and the characteristic requirements of receipts and requirements in the production process model (PPM) can be seen in the following table:
|
PPM |
Characteristic Value Assignments |
Characteristic Requirements |
|
Logical component for receipt |
· Characteristic propagation · Planning parameters · Pegging (later in the order) |
Comparison with requirement for order (PPM selection) |
|
Logical component for requirement |
· Comparison with rules (configuration) · Inclusion in macro (planning parameters) |
Comparison with receipts on lower production level (later in the order, pegging) |
|
Planning activity |
· Characteristic value assignment (for block planning) · Planning parameters · Rules |
|
|
Plan |
Rules |
|
|
Operation |
· Rules · Planning parameters |
|
In the comparison, the relationship between characteristic value assignments and characteristic requirements for receipts and requirements in the order is shown in the following table:
|
Order |
Characteristic Value Assignments |
Characteristic Requirements |
|
Receipt |
Comparison with requirements on higher production level (pegging) |
|
|
Requirement |
Create order at lower level |
Pegging |
|
Activity |
Comparison with block on the resource (block planning) |
|