Start of Content Area
fixed date (SCM-APO-PPS)

Production Planning and Detailed Scheduling (SCM-APO-PPS)

Status of an order in Production Planning.

An order with the status date fixed contains at least one operation that is fixed on a resource at a specific time. With detailed scheduling in production planning, the system can only change the dates and resource allocation of unfixed operations.

End of Content Area