| planning-related offset (SCM-APO-PPS) |
Determines the time interval between the requirement (input node) and the start of the activity in project manufacturing during scheduling with planning-related minimum intervals.
The planning-related offset provides the planner with leeway in planning.
In scheduling with heuristics, the planner can use the planning-related offset to increase the interval between the requirement and the start of the activity.
The planning-related offset must lie before the offset, which is stored in the master data as the 'process-related' offset.