Choose
.The screen
Configuration:
Initial Screen
appears.
Enter the material and the application, and choose
.The screen
Configuration:
Characteristic Value Assignment
appears.
Choose
.The dialog box
Variant Costing
appears.
Enter a costing variant and choose
Enter
.
The dialog box
Control Parameters
appears.
Enter the following data:
Costing dates
Transfer control
Choose
Enter
.
The screen
Variant Costing: Costing Data for Material
appears. The system shows you the costing results based on the costing variant you used.
The cost estimate for a variant is only simulated with this function. It is not saved.
See also:
Planned Costs in Variant Processing
For information on calculating overhead expenses, both in general and with respect to configuration simulation, refer to the section Overhead in Sales-Order-Related Production .