The results analysis version allows you to simultaneously carry out the valuation of a particular WBS element in line with GCC and IAS. You define different versions to enable you to update different valuations of one particular WBS element.
Note
For
Profitability Analysis (CO-PA)
, you can only settle results analysis data which has been calculated with results analysis version 0. For more information see the
Accounting
component in the SAP Library under
You can find information about prerequisites in the implementation guide in the documentation for the IMG activities mentioned below.
Create a version.
a.In Customizing for
Controlling
choose
Make sure you activate the version for the results analysis.
b. Choose
General Version Definition
in the left screen area.
c. Flag the indicator
WIP/RA
so that data from the results analysis and WIP calculation is administrated in the version.
d. In the left screen area choose
Controlling Area Settings
e. Set the flag
WIP/RA
to activate the controlling area for the results analysis.
f. Save your input.
Process the version-specific settings for the results analysis.
a.In Customizing for
Project System
under
b. Enter the
Technical Results Analysis Cost Element
.
c. Save your input.
Valuation in line with the German Commercial Code and the International Accounting Standard is updated in different versions. For GCC valuation you define version 0 and for IAS valuation version 1.
Separation of the assets is not possible.