Using the
Parallel teardown/wait
indicator on the
Interoperation times
tab page of the operation you can control whether the wait time and teardown time are to be scheduled as simultaneous or consecutive operation segments. The parallel positioning of teardown time and wait time reduces the lead time of the operation.