 Executing Unplanned Withdrawal of Components for an Order

Use

You can withdraw materials for an order that are not listed as components in the order. These "unplanned withdrawals" cause the actual costs of the production order to be updated.

Procedure

  1. Choose Start of the navigation path Logistics Next navigation step Materials management Next navigation step Inventory management Next navigation step Goods movement Next navigation step Goods issue Next navigation step . End of the navigation path

  2. Choose Start of the navigation path Movement type Next navigation step Consumption Next navigation step To order Next navigation step From warehouse Next navigation step . The system automatically proposes movement type 261 (goods issue for order). End of the navigation path

  3. Enter the storage location from which the goods withdrawal should take place. Choose .

  4. The system automatically branches to the screen Enter Goods Issue: New Items.

  5. Enter the number of the production order, as well as the material number, quantity, unit of measure and, if necessary, the batch number for each material that should be withdrawn. Save the goods issue.