Show TOC

 Example of Base Value Incorporated in a Purchase Order

In the purchasing info record the purchase price PR00 for the material of a vendor is EUR800 per 1000m.

The rate determination key with a day rate (EUR200) is used and the incorporated base value of the vendor is EUR100 per 100kg of NF metal.

Assuming a material of 1000m contains 100kg of NF metal, a difference of EUR100 is added to the purchase order price. The total price in the purchase order is therefore EUR900 per 1000m of cable.