Sample Management (QM-IM-SM)
Sample Management During Goods Receipt
Sample Management During Production
Planning the Physical Samples
Sample-Drawing Procedure
Planning the Sample-Drawing Procedure
Determining the Physical-Sample Sizes
Creating a Sample-Drawing Procedure
Assigning a Sample-Drawing Procedure to a Task List
Setting the Inspection-Point Valuation Mode
Change Documents for Sample-Drawing Procedures
Sampling Scheme
Creating a Sampling Scheme for a Sample-Drawing Procedure
Inspection Point (Physical Samples)
Sampling Procedure
Creating a Sampling Procedure for Physical Samples
Processing Planned Physical Samples in an Inspecti
Inspection Lot Creation with Planned Physical Samp
Physical-Sample Record
Status Management for Physical-Sample Records
Change Documents for Physical-Sample Records
Manual Creation of Physical Samples
Creating a Physical-Sample Record Manually
Maintaining Data for a Physical Sample
Mass Maintenance of Physical-Sample Storage Data
Physical-Sample Drawing
Automatic Assignment of Physical-Sample Drawing
Digital Signature in QM
Entering a Digital Signature
Processing a Physical-Sample Drawing
Sample-Drawing Instruction
Printout of Sample-Drawing Instruction
Label Printing for Physical Samples
Results Recording for Physical Samples
Usage Decision for Inspection Lot
Processing Unplanned Physical Samples
New Physical-Sample Drawing with Reference
Creating a New Physical-Sample Drawing
Creating and Preparing Physical Samples for Inspection
Manual Inspection Lots for Physical Samples
Creating Inspection Lots for Physical Samples