 Confirming Installation/Dismantling Information

Procedure for Overall Completion Confirmation

  1. Select the overall completion confirmation and enter data as required in the header data section. (Refer to Using the Overall Completion Confirmation )

  1. Choose Continue .

  1. Choose Start of the navigation path Environment Next navigation step Change <equipment/functional location> End of the navigation path .

  2. Note the following:

    The overall completion confirmation saves all the data , which has been displayed in one step on the entry screen or the accompanying dialog boxes. It also saves proposal data .

    If you do not want to save certain confirmation or proposal data, you must delete these lines from the tables before saving.

  3. If required, save the previously entered confirmation data.

The master record appears for the selected reference object for the order that you have just confirmed.

  1. Make the required changes using the Structuring menu.

For more information, see Installation/Dismantling from Equipment Master Record and Installation/Dismantling from Master Record of Functional Location .

  1. Save the changes to the master record.

Procedure for Individual Time Confirmation

  1. Call up the structure list for the reference object for the order using Start of the navigation path Environment Next navigation step Structure list End of the navigation path .

You see the structure of the relevant technical object, and can explode this further using the menu functions available.

  1. Select the technical object that you want to install or dismantle.

Note Note

When selecting the object to be processed, note the following:

After you have entered the installation or dismantling function for the object, the structure list for the selected object is restructured. This means, for example, that:

End of the note.
  • If you select a piece of equipment and dismantle it, the structure list, which you return to after dismantling, contains only the equipment selected.

  • If you select a functional location and dismantle a piece of equipment from it, the structure list, which you return to after dismantling, no longer contains the dismantled equipment.

  1. Choose Start of the navigation path List Next navigation step List editing Next navigation step Change End of the navigation path .

The master record for the technical object appears.

Here you can enter the installation or dismantling information using the functions in the Structuring menu. For more information, see Equipment at Functional Locations .

  1. Save the change to the master record.

You return to the structure list.

  1. Choose Start of the navigation path Goto Next navigation step Back End of the navigation path .

You return to the confirmation detail screen for the operation.

Note Note

If you use the Save function during processing, you always save all the data entered so far for the operations you have processed. You always return to the initial screen for individual time confirmation.

End of the note.
  1. Save the completion confirmation.