You can establish object links between specifications and materials in the SAP component Material Master (LO-MD-MM) . This allows you to create a link to other logistics processes. For example, you can assign a raw material to a basic material.
The material contains logistics data, such as price, weight, and dimensions. This data depends on an article’s packaging size or trading units.
The specification supplies the data on the properties. This data is independent of an article’s packaging size or trading units.
If the material carries the environmentally relevant indicator and a delivery is posted to this material, the SAP system checks whether the material is assigned to a specification that requires a material safety data sheet, and then, if necessary, triggers material safety data sheet shipping .
The following graphic illustrates the possible relationships between materials and specifications.
You have created the materials in the
material master
.
In the
Basic Data 2
view of the material master, you have set the
Environmentally relevant
indicator for materials that require a material safety data sheet.
The specification belongs to a specification type for which the
Mat. assignment
indicator has been set in the IMG activity
Specify Specification Categories
in Customizing for
Basic Data and Tools
.
You have the following options for the assignment:
You can assign one or more materials to a specification (such as a real substance).
You can assign one material to several specifications (such as real substances).
You can specify a plant for a material.
After you have assigned a material and plant, the SAP system checks whether:
The material and plant exist
The material exists in the plant
The combination of material and plant must be a valid plant material.
The material-plant combination is unique
The combination can only be assigned once to one specification only. You must enter the material either always without a plant, or always with a plant.
Note
If you do not enter a plant for a material, the assignment is valid for all plants in which the material occurs.
For more information, see the SAP component Material Master (LO-MD-MM) .
In the standard system, the material short text for assigned materials is output in the SAP
Environment, Health and Safety
(EH&S) component on the
Material assignments
tab page. In Customizing for
Basic Data and Tools
the SAP enhancement C1060001 is available for you to use in the IMG activity
Develop Enhancement for Material Names
. You can use this enhancement to output other material descriptions in addition to the material short text (for example, descriptions from the material classification).
You assign a specification to a material in the specification workbench in the header data of the specification.
Follow the procedure
Creating Specifications
or
Editing Specifications
and choose the
Material assignments
tab page.
In the
Material
field, enter the material key.
Note
You can use the editing functions from the
Edit
menu for selected materials.
If required, limit the assignment to one or more plants.
Save your entries.
Note
For specifications of the specification category
Substance
, you can also make the assignment in the
Material master
. The
Material master
has been enhanced without modifications for this purpose by adding the necessary data screen. For more information, see
Assignment of Materials and Substances
.