Show TOC

 Assigning a General Maintenance Task List

Prerequisites

The following prerequisites must be fulfilled for you to assign a maintenance task list to a maintenance item.

  • For time-based and performance-based maintenance plans with a strategy, the maintenance task list and the maintenance item must have the same strategy.

  • The status Released must be set.

Procedure

  1. On the item data screen, choose Start of the navigation path Goto Next navigation step Task list Next navigation step Select GenTaskList. End of the navigation path

  2. You now have three options for choosing a general maintenance task list:

    For the assembly

    For the object structure

    With general criteria

  3. When you have chosen one of the above options, the system displays a list of the maintenance task lists that are relevant for your technical object and strategy specifications or correspond to your general criteria.

  4. If only one task list fulfils the criteria in your maintenance item, the system assigns this task list to the maintenance item immediately.

    You save this assignment using Start of the navigation path Maintenance item Next navigation step Save End of the navigation path .

  5. To display a maintenance task list from the list, select the required maintenance task list and choose Start of the navigation path Goto Next navigation step Task list End of the navigation path .

  6. You reach the maintenance task list.

    You can page through the various screens using the Goto menu bar.

  7. To assign a maintenance task list to your maintenance item, select the required maintenance task list and choose Start of the navigation path Edit Next navigation step Choose End of the navigation path .

  8. The system assigns the maintenance task list to your maintenance item and enters the data in the section Task list data .

  9. To maintain the task list factor or the system condition, choose Start of the navigation path Goto Next navigation step Task list details End of the navigation path .

  10. Save the assignment using Start of the navigation path Maintenance item Next navigation step Save End of the navigation path .