 Planning Variable-Size Items

  1. Call up the order in change mode, and choose the operation overview.

  2. Select the operations, for which you want to plan material, and call up the component overview. To do this, you have the following options:

  3. - To display the material components for all order operations , call up the Component overview .

    - To display the material components for a particular operation , select the required operation and then call up the Component overview .

  4. Enter Variable-size item as the item category. Enter all the variable-size items required, together with any further information needed for the operation in the list.

  5. If you are on the overview screen for the material components of all the order operations, you must also enter the operation for which each material is being planned. However, if there is only one operation in this order, the material is automatically assigned to this operation.

    Choose Continue .

  6. Select the variable-size items for which you want to specify additional data. Choose Start of the navigation path General Next navigation step (Detail view: General data) Next navigation step Variable-size item data End of the navigation path .

  7. Make all the necessary entries. Use Next component to reach the variable-size item data screen for the next variable-size item selected.

  8. To return to the component overview, choose Start of the navigation path Goto Next navigation step Back End of the navigation path .

  9. Save the order.