Show TOC

 Goods Issue With Reference to a Bill of Material

To withdraw all components of a bill of material (production BOM or equipment BOM), you can reference the relevant bill of material. In this case, all of the components in the BOM are automatically copied for goods issue.

Entering Goods Issue With Reference to a Bill of Material

To enter a goods issue with reference to a bill of material, proceed as follows:

  1. From the Inventory Management menu, select Start of the navigation path Goods movement Next navigation step Goods issue End of the navigation path . This takes you to the initial screen for this function.

  2. Enter the data on the initial screen:

    1. Enter the header data.

    2. Select Start of the navigation path Movement type Next navigation step Consumption End of the navigation path plus the desired movement type.

    3. Enter a plant and, if necessary, a storage location, as defaults for the items in the document.

  3. Select Start of the navigation path Goods issue Next navigation step Create w.reference Next navigation step To BOM... End of the navigation path . A dialog box appears in which you enter the BOM.

  4. The BOM application is usually suggested automatically by the system.

    Enter a material or a piece of equipment. If you do not enter an alternative BOM, the system automatically determines an alternative on the basis of the application specified.

    Enter a quantity. On the basis of this quantity, the system calculates the quantity to be withdrawn for the individual components.

  5. There are several ways to adopt (copy) the component items:

    1. When you select Continue , the item selection screen is displayed. On this screen, you can select and process the items to be copied.

    2. Choose Copy (adopt) to adopt all of the items entered. The overview screen appears.

    3. Choose Copy (adopt) + Detail to adopt all of the items entered. The detail screen for the first item appears.

    If the item currently displayed on the detail screen is not one that you want to be copied, you can skip that item by selecting Cancel .

  6. Check data on the overview screen.

  7. Post the document.