Operation Selection
Task list 1234567, "Inspection":
Task List Operations |
Selection |
Task List Operations in Order |
0010Renew spark plugs |
X |
0010Renew spark plugs |
0020Oil change |
||
0030Renew oil filter |
X |
0030Renew oil filter |
0040Renew air filter |
||
0050Check brakes |
X |
0050Check brakes |
0060Check headlamp alignment |
Renumbering of Operations
The following two task lists are included with the operation selection:
Task List |
Operation Number |
Selection |
Task list 1 |
0030 |
X |
0060 |
||
0090 |
||
0120 |
X |
|
0150 |
||
Task list 2 |
0040 |
|
0080 |
X |
|
0120 |
||
0160 |
X |
|
0200 |
For a set increment of 0010 , the system renumbers the operations included in the order as follows:
Task List |
Original Operation Number |
New Operation Number in Order |
Task list 1 |
0030 |
0010 |
0120 |
0020 |
|
Task list 2 |
0080 |
0030 |
0160 |
0040 |
One-Time Complete Inclusion
First calling up of the task list for order 90001 with the first operation selection:
Selectable Task List Operations |
First Operation Selection |
Task List Operations in Order |
0010Renew spark plugs |
X |
0010Renew spark plugs |
0020Oil change |
||
0030Renew oil filter |
X |
0030Renew oil filter |
0040Renew air filter |
Second calling up of the task list for order 90001 with the second operation selection:
Selectable Task List Operations |
Second Operation Selection |
Task List Operations in Order |
0020Oil change |
X |
0010Renew spark plugs |
0040Renew air filter |
0030Renew oil filter |
|
0050Oil change |
Operation Sorting
First calling up of the task list for order 900012 with the first operation selection:
Selectable Task List Operations |
Selection |
Task List Operations in Order |
0010Renew spark plugs |
X |
0010Renew spark plugs |
0020Oil change |
||
0030Renew oil filter |
X |
0030Renew oil filter |
0040Renew air filter |
||
0050Check brakes |
X |
0050Check brakes |
0060Check headlamp alignment |
Second calling up of the task list for order 900012 with the second operation selection:
Selectable Task List Operations |
Selection |
Task List Operations in Order |
0010Renew spark plugs |
||
0020Oil change |
X |
0020Oil change |
0030Renew oil filter |
||
0040Renew air filter |
||
0050Check brakes |
||
0060Check headlamp alignment |
Work Center Selection
The work center "Mechanics" was chosen as the work center:
Operations with Work Center |
Sub-Operations with Work Center |
Selection |
Operations/Sub-Operations Offered for Selection |
0010Mechanics |
- |
X |
0010Mechanics |
0020Electrics |
- |
0020Electrics |
|
- |
0020 - 0010Mechanics |
X |
0020 - 0010Mechanics |
- |
0020 - 0020Electrics |
- |
|
0030Mechanics |
- |
X |
0030Mechanics |
0040Electrics |
- |
- |
Change of Work Center
In a company, task lists have been created whose operations contain dummy work centers. If one of these task lists is selected for an order, the system displays the dialog box for selecting a work center. The planner overwrites the dummy work centers with the work centers that should execute the work. Then the planner selects the operations to be executed and incorporates this special version of the task list into the order.