Report with which you can analyze planned costs using product drilldowns in
Product Cost by Order
. The reporting time frame can be cumulative or restricted.
This report displays the planned costs and plan quantities updated to an object and can be used in the analysis of planning data.
In
Product Cost by Order
, the planned costs on a costing object result from the preliminary cost estimate of the manufacturing order.
The following data is shown based on key figures and/or original cost elements:
Total planned costs
Planned fixed costs
Planned variable costs
Planned input quantity
Planned output quantity
Object information
Reporting time frame
You must perform a preliminary costing for the manufacturing order.
No
planned costs are updated to the product cost collector during a preliminary costing of the product cost collector in
Product Cost by Period
(see also:
Product Cost by Period Information System
).
See also:
For information on preliminary costing in
Product Cost by Order
, see the following sections:
Preliminary Costing of Manufacturing Orders
Preliminary Costing of CO Production Orders
See the following section for information on the presentation of values determined during preliminary costing of product cost collectors.