Show TOC

 Planning Stock Material

Use

To plan stock material for order operations, proceed as follows:

Procedure

  1. Call up the order in change mode, and choose the operation overview.

  2. Select the operations, for which you want to plan material, and call up the component overview. To do this, you have the following options:

    • To display the material components for all order operations, call up the component overview.

    • To display the material components for a particular operation, select the required operation and then call up the component overview.

  3. Enter Stock item as the item category. Enter the stock material required and any additional information needed for the operation in the list.

  4. If you are on the overview screen for the material components of all the order operations, you must also enter the operation for which each material is being planned. However, if there is only one operation in this order, the material is automatically assigned to this operation.

  5. Save the order.