 Example Processes with Documentary Batches

Which documentary batch has been delivered to which customer?

In your company, it is necessary for you to be able to trace which products have been delivered to which customers. In this process, it is not necessary to be able to trace documentary batches in the production process. Therefore, you only want to enter documentary batches when posting the outbound delivery to the customer.

The following graphic shows the process steps in which documentary batches can be entered and in which process steps they have actually been entered:

Which documentary batches are used in which production process?

You want to produce the fruit juice FERT_1000.

The following graphic shows the process steps in which documentary batches can be entered and in which process steps they have actually been entered:

You want to produce the fruit juice FERT_1000.

When the ingredients ROH_1201 and ROH_1202 are issued to production (goods issue), you enter real batches.

After both ingredients have been mixed into the concentrate HALB_1200, you enter a goods receipt from production with documentary batches.

You add the material PIPELINE_100 and enter the goods issues of the concentrate HALB_1200 with documentary batches.

You enter the goods receipt of the fruit juice FERT_1000 from production with documentary batches.

This means that you can use batches, documentary batches and "normal" materials together, in various manufacturing levels.